To cut its dependence on diesel-generated electricity, the lakeside northern community of Whati studied construction of a hydroelectric system powered by running water from the nearby La Martre River Falls, which flow out of Lac Le Martre.
The study found that energy from the river's natural flow could provide 1,200 kilowatts of hydro power, enough to replace the 1,015 kilowatts supplied by the community's diesel generators. The project would require construction of a reservoir, a turbine-equipped powerhouse fed by a 1,284-metre pipe from the river, and overhead wires to distribute the electricity.
The system would eliminate the need to truck in 400,000 litres of diesel fuel each year from Yellowknife, which is 164 kilometres to the southeast over roads only open in the winter.
Results
Environmental
Economic
Social
1,370 tonnes of greenhouse gas emissions cut annually by using electricity from hydro, not diesel fuel
400,000 litres of diesel fuel unconsumed
Hydro plant construction jobs
Diesel-fuel trucking costs eliminated
Local source of electricity will provide a reliable supply of power
Local power will boost community sense of independence
Challenges
Funding for the hydroelectric project is subject to Northwest Territory budget constraints.
Reliability of the water supply could be threatened by weather conditions.
Lower winter water flows could lead to electricity restrictions when cold weather demand is highest.
Lessons learned
Storage reservoirs may be needed to ensure sufficient water to generate power and maintain river ecosystems.
Be prepared for a lengthy study period.
Government financing for alternative energy projects can be uncertain.
Sonny Zoe
Community Energy Coordinator
Whati, NT
T. 867-573-3401
Want to explore all GMF-funded projects? Check out the Projects Database for a complete overview of funded projects and get inspired by municipalities of all sizes, across Canada.
Centre for Sustainable Development: A Green Demonstration Building
The City of Montreal and Équiterre, an agency that promotes environmental and social responsibility, designed and built the first Quebec building to achieve Leadership in Energy and Environmental Design (LEED) Platinum certification.
The Centre for Sustainable Development is a 65,000-square-foot green building in downtown Montreal's entertainment district that houses Équiterre and several sustainable-development organizations. In addition to offices, the building has a sustainable development interpretative centre.
Planners brought together city and Hydro-Québec officials, architects, builders and other stakeholders to design the centre. Geothermal heating and other energy-efficiency measures were incorporated to help cut energy consumption. A fresh-air ventilation system and a wall covered with plants provides first-rate air quality.
Results
Environmental
Economic
Social
60%-65% reduction in energy use resulting from green construction, heating and lighting
Improved air qualityfrom fresh-air ventilation, wall of plants
60%-65% reduction in heating, lighting, ventilation and other energy costs
Cost savings are incentives for more green construction
Green building offers healthier, more comfortable workplace
Interpretative centre provides educational and research tool for sustainable building
Challenges
Coordinating a diverse group of project participants.
Incorporating a significant amount of recovered, reused and recycled material into the building's construction.
Modifying designs to keep construction costs on budget.
Lessons learned
Employ an integrated team that can meet regularly to solve planning and design questions.
Involve municipal and public utility officials to facilitate regulatory and other public aspects of the process.
Make public education a part of the project to foster awareness of sustainable development.
Normand Roy
Équiterre
Montreal, QC
T. 514-214-3375
Want to explore all GMF-funded projects? Check out the Projects Database for a complete overview of funded projects and get inspired by municipalities of all sizes, across Canada.
City of Kingston Energy Retrofit Feasibility Study
The City of Kingston audited energy and water use in 37 municipal buildings, looking for ways to reduce consumption.
Lighting, heating, cooling, insulation and automated systems were examined for energy-saving opportunities. The city endorsed a series of specific retrofits for each building, from changing the types of lamps used to installing occupancy sensors. The audit revealed that reprogramming building automation systems - for example, adjusting thermostat set temperatures - could significantly reduce energy consumption. The changes were estimated to cost $3,130,800 but provide $351,800 in savings per year. With provincial and federal grants, the payback period was estimated at 8.3 years.
The city has carried out most of the recommended retrofits. Reducing utility consumption will cut greenhouse gas emissions and save the city money.
Results
Environmental
Economic
Social
Lower consumption of natural gas, electricity and water, and reduced greenhouse gas emissions
Utility cost savings will mean an attractive payback period on retrofits of 8.3 years
The retrofits provide residents with a good example of energy conservation
Challenges
The initial scope of the study, which included major building-system upgrades and options for renewable energy, was too broad.
Auditing 37 buildings took a lot of time.
Lessons learned
Target buildings with the greatest energy use instead of auditing energy use in every municipal building.
Use the same engineering firm for the audit and the work - and sign an energy performance contract as a guarantee of their forecasted energy savings.
Make sure to involve building operators in the study. They know their buildings and can help assess how practical it will be to implement the recommendations.
Make sure building operators get training on the retrofits.
Debra Krakow
Project Manager
City of Kingston, ON
T. 613-546-4291, ext. 3120
Want to explore all GMF-funded projects? Check out the Projects Database for a complete overview of funded projects and get inspired by municipalities of all sizes, across Canada.
Surrey Civic Centre District Energy Feasibility Study
The City of Surrey studied the feasibility of a district energy system (DES) for its new civic centre and its growing central business area. A DES distributes heating and cooling to a number of buildings from a central source. The study team decided that a geothermal system could serve the buildings in the civic centre complex. For the next phase of downtown development, the team recommended a gas-fired boiler plant. Phase 3 would replace the gas-fired system with a large biomass-fueled plant. The DES will be operated by Surrey City Energy, a municipally-owned utility created in January 2011.
Results
Environmental
Economic
Social
Reduced greenhouse gas emissions from elimination of multiple heating and cooling systems in the downtown core.
Increased energy security from use of renewable, locally-sourced energy.
DES will reduce energy costs, stimulate economic development and create jobs.
DES may provide a long-term source of revenue for the city.
DES will help revitalize the downtown core.
DES will increase public awareness of energy sustainability.
Challenges
Designing a heating and cooling system to serve up to 800,000 square metres by 2030
Meeting the renewable energy requirement of the City's sustainability charter
Expanding the district energy system through three phases of downtown development
Developing a customer base that will follow the system from natural gas to a low-carbon renewable fuel source
Lessons learned
Consider the needs of future customers when planning a district energy system.
Examine existing systems in other cities to gain a full appreciation of technologies and their benefits.
Create a project team with technical, financial and regulatory expertise.
Jason Owen
Acting Manager District Energy Section
City of Surrey, BC
T. 604-591-4742
Want to explore all GMF-funded projects? Check out the Projects Database for a complete overview of funded projects and get inspired by municipalities of all sizes, across Canada.
The coastal town of St. Andrews in southwest New Brunswick has upgraded its wastewater treatment plant to meet environmental standards, improve the quality of life for residents, and create capacity for growth.
To minimize costs and the environmental impact of construction, the town chose to deepen and line one of its two treatment ponds, introduce aeration and UV disinfection systems and install a monitoring and control system. The upgrade has reduced key pollutants by 85 to 90 percent and eliminated the need to treat effluent with chlorine. The new system also minimizes the chance of releasing untreated effluent into Passamaquoddy Bay.
The upgraded water treatment system has reduced health risks, cut noise pollution and minimized offensive odours. The additional treatment capacity has also made it possible for St. Andrews to plan for long-term sustainable economic development.
Results
Environmental
Economic
Social
Reduced levels of bacteria, suspended solids and trace chlorine in effluent.
Reduced the chance of untreated effluent discharges during power outages.
Upgrade saves on maintenance and repair costs and cuts energy use.
Construction provided a boost for local businesses.
Increased capacity will allow growth and sustainable development.
The project improved quality of life by reducing health risks, cutting noise pollution and minimizing odours.
The upgrade made working conditions for municipal employees safer.
Challenges
Quotes for the project came in about 15 percent over budget. The town sought additional funding and accepted design changes that cut costs without jeopardizing key objectives. Town planners advise other communities to prepare a budget with a 25 percent allowance for contingencies.
Additional budget issues arose once the project was underway. The contractor had to remove more sludge than expected and an unusually cool wet spring caused delays.
Lessons learned
Do your own research. Small municipalities may rely heavily on consultants but it is important to find out about new technologies and to contact organizations with experiences to share.
Envision and plan for the worst-case scenario. Build financial and scheduling flexibility into your plan.
Keep residents informed. Start early with public meetings to explain the project and its benefits.
Schedule regular meetings between the contractor, consultant and municipality. Continuous communication will help you foresee and address issues.
Want to explore all GMF-funded projects? Check out the Projects Database for a complete overview of funded projects and get inspired by municipalities of all sizes, across Canada.
As part of a plan to revitalize the community's waterfront, the Squamish Oceanfront Development Corp. did soil and groundwater tests to see whether an old warehouse known as the Blue Barn could be used as an art, culture and heritage centre.
The warehouse, built in 1965 and most recently used as a site to treat mercury-contaminated groundwater, had been cleaned up and emptied of its chemical tanks and other water-treating equipment. The tests were done to see whether that cleanup made the building unsafe for use by polluting soil and groundwater under and around it.
Results revealed some minor contamination, but not enough to stop the Blue Barn's redevelopment as a jewel in what the district sees as a sparkling waterfront commercial and cultural area.
Results
Environmental
Economic
Social
Containing minor contamination near the Blue Barn will prevent risk to the environment and human health
Cleanup and reuse of a contaminated brownfield site
Blue Barn arts centre would encourage redevelopment of a derelict industrial district
Project would diversify the local economy, add jobs, attract tourists
Blue Barn would provide space for the arts community, fostering cultural growth
Centrepiece of a waterfront community where people work, learn, live and play
Challenges
Tight funding deadlines.
High cost of brownfield remediation.
Re-deploying staff for the time-consuming work of applying for funding and reporting on results.
Lessons learned
Be prepared for tight funding deadlines that can disrupt previously established project work schedules.
Despite their costs, remediation projects are worth the money. They trigger major economic redevelopment.
Set aside ample time to gather documents, write applications and prepare reports essential to the funding process.
Heather Dunham
Manager, Squamish Oceanfront Development Corp.
District of Squamish, BC
T. 604-815-5075
Want to explore all GMF-funded projects? Check out the Projects Database for a complete overview of funded projects and get inspired by municipalities of all sizes, across Canada.
City of Guelph Residential Grey water Reuse Feasibility Study
To find further ways to conserve its finite groundwater resources, the City of Guelph studied a residential greywater reuse system that flushes residential toilets with water from showers and baths.
In the field test, 25 homeowners installed grey water recycling systems. Water quality, water consumption and energy usage were monitored for up to two years. While the overall satisfaction with the systems was high, many homeowners did not like cleaning the filters and grey water quality did not always meet Health Canada standards.
Flushing toilets with grey water can reduce household water use by up to 30 percent. But with decades-long payback periods, these systems are not financially attractive to homeowners. Ironically, the presence of water-efficient fixtures in the home further reduces the savings possible from grey water systems.
The city is working to improve residential grey water reuse technologies and encouraging industry to continue to adopt water reuse technologies.
Results
Environmental
Economic
Social
Saving 16.6 L of water L per person per day
Making more sustainable use of the groundwater supply
Reducing effluent going into the Speed River
Saving from reduced demand for treatment of water for household use
Saving from reduced volume of wastewater to be processed
Homeowners reported high satisfaction with the systems and few concerns about the safety of grey water
Challenges
Water savings were difficult to calculate, because some households did not produce enough grey water for toilet flushing and had to use varying amounts of potable water.
This dilution of the grey water by potable water affected samples.
Homeowners must be committed to the regular maintenance of the system.
Some homeowners find the colour and smell of grey water displeasing.
Lessons learned
Provide more training on the use and maintenance of the system to field test participants.
Develop a support network through education of tradespeople and contractors.
Provide rebates and other incentives to get residents to invest in these systems.
Wayne Galliher
Water Conservation Project Manager
City of Guelph, ON
T. 519-822-1260, ext. 2106
Want to explore all GMF-funded projects? Check out the Projects Database for a complete overview of funded projects and get inspired by municipalities of all sizes, across Canada.
Cleaning up contaminants and redeveloping a brownfield site can bring communities a number of environmental, economic and social benefits. You can achieve even greater benefits by incorporating sustainable approaches throughout the site remediation and risk management activities.
Environmental benefits
Lower risk of soil, surface water and groundwater contamination
Fewer GHGs through decreased urban sprawl and commuting
Less or no waste
Energy savings
Protected ecosystem and habitat
Economic benefits
New development opportunities
Job creation
Increased property values
Higher tax revenues
Lower energy costs
Lower water costs
Lower landfill disposal costs
Reduced landfill space
Social benefits
Revitalized neighbourhoods
More public space
Improved public health and safety
Job creation
Benefits at all stages: reap the rewards
Project Stage
Activities
Environmental Benefits
Economic Benefits
Social Benefits
Planning
Develop a water conservation plan
•
•
Develop a waste minimization or recycling plan
•
•
Implement idling restrictions on vehicles and construction equipment
•
•
Consider interim uses for sites that will be under-used for extended periods (e.g. community gardens, solar panels)
•
•
Site Assessment
Seek community involvement to increase public awareness and acceptance.
•
Use passive sampling devices.
•
Use on-site analytical techniques.
•
Use telemetry or remote data collection.
•
Remediation/Risk management
Sequence work to minimize handling materials twice.
•
Reduce excavation and off-site disposal.
•
•
Consider technologies that destroy contaminants without creating waste or additional contamination.
Use energy-efficient equipment and optimize equipment performance
•
•
Incorporate renewable energy sources, such as wind or solar, into treatment systems.
•
•
Use construction equipment with enhanced emission controls.
•
Examples
Remediation of Strathcona Shooting Range, City of Edmonton, AB
With its growing population and a related demand for recreational facilities, the City of Edmonton decided to convert the Strathcona Shooting Range to a multi-use sports and recreational facility. By using a sustainable approach, testing for lead and other contaminants was carried out on-site, rather than in a laboratory, and soil was excavated at the same time as when the on-site soil analysis took place. This project received support from FCM's Green Municipal Fund, and was completed for less than half the original $9 million estimate to remove lead and other soil contaminants.
Environmental benefits
Eliminated further contamination from shooting activities
Reduced soil handling and less soil excavated.
Economic benefits
No need to convert other valuable land into sports fields.
Reduced transportation of analytical samples and limited laboratory costs.
Selective excavation of soil known to be contaminated.
Social benefits
A much-needed recreational and sport field space for the community.
New Town Hall, Town of the Blue Mountains, ON
When the Town of the Blue Mountains found itself with too little space to meet its administrative needs, it chose to build a new town hall on a brownfield site. The town avoided moving contaminated soil to landfill by using an on-site bioremediation process to break down the contaminants and by using the remediated material as a landfill cap. Geothermal wells were installed in areas where soil would be excavated. This project received support from FCM's Green Municipal Fund.
Environmental benefits
Reduced soil excavation
Eliminated contamination rather than disposed of contaminated soi.
Economic benefits
Less labour and excavation time
Reduced landfill fees and extended landfill life.Selective excavation of soil known to be contaminated
No need to use valuable materials for covers
Social benefits
Reduced health risk due to less handling of contaminated soil
Landfill transformed to residential land, City of St. Catharines, ON
The City of St. Catharines used a series of sustainable approaches to convert a former landfill into a residential area. The project was Ontario's first large-scale initiative of its kind. The municipality gained 3.5 acres of new residential lands, and increased available housing and tax revenues. This project was a finalist in the Sustainable Remediation Technologies and Technological Innovation category for the 2009 Canadian Urban Institute's Brownie Awards.
Environmental benefits
Soil contaminated with petroleum bioremediated on-site.
Metal and tires from the landfill were recycled and other waste material was reused as golf course fill
Economic benefits
Sustainable approach to remediation diverted waste from landfill
Redevelopment into residential area increased tax revenue
Social benefits
Landfill site was redeveloped as residential property.
Want to know more?
See these websites for more information on sustainable remediation and risk management metrics:
To cut pollution threatening fish and groundwater, the Municipality of the District of Argyle updated sewage-treatment facilities in the seaside village of West Pubnico with screens and ultraviolet light that disinfects effluent before releasing it into Lobster Bay.
The upgrades will allow the municipality to expand its sewer system to homes with septic tanks - a move that had been delayed because the 30-year-old plant's chlorine-disinfection chambers could no longer consistently clean wastewater to comply with anti-pollution standards.
The improvements clear the way for more sewer lines, reducing the risk that groundwater contamination from septic tanks will make drinking water unsafe. Plant updates include a wastewater heating system that will lower plant energy costs, as well as a sludge-drying process that will make sewage solids less costly to truck away.
Results
Environmental
Economic
Social
400,000 litres of ocean-bound effluent disinfected each day
Wastewater heat-exchange system cuts energy consumption, GHG emissions
$50,000 annual saving in sludge trucking costs
Lower energy costs thanks to heat exchanger
Lower maintenance costs with new system
Plant will accommodate more sewage, cutting need for homeowner septic tanks
Retrofit protects a fishery that residents depend on for their livelihood
Challenges
Finding a way to lower high sludge-disposal costs.
Meeting provincial disinfectant standards for ocean-discharged wastewater.
Keeping the ocean free of sewage that would endanger fishing and processing jobs.
Lessons learned
Conduct rigorous evaluations to prevent equipment cost surprises.
Be prepared to eliminate less-essential project features to stay within budget.
Using sewer wastewater for heat can cut costs and may align with eligibility criteria for green infrastructure grants.
Want to explore all GMF-funded projects? Check out the Projects Database for a complete overview of funded projects and get inspired by municipalities of all sizes, across Canada.
The rapidly growing City of Cranbrook has upgraded its wastewater systems to improve effluent quality, reduce operating costs, cut GHG emissions and allow for population growth over the next 20 years.
Cranbrook's current wastewater treatment system, which was cutting-edge when it was built more than 40 years ago, uses reclaimed water to irrigate agricultural lands, boosting the local economy. Building on that legacy, the upgrades include a new storage pond, and aeration and disinfecting equipment that that treat sewage with natural biochemical processes. Reclaimed water from the improved system exceeds health and safety standards and can be used to irrigate recreational as well as agricultural lands.
Restoring and upgrading Cranbrook's existing facility has created a showpiece for efficient wastewater management. The upgraded system produces lower GHG emissions, uses less power and has significantly lower operating costs.
Cranbook's wastewater improvement project was the 2012 FCM Sustainable Communities Awards winner for water.
Results
Environmental
Economic
Social
Annual GHG emissions have been reduced by 75% for lagoons and 54% for storage ponds
Treated wastewater has fewer suspended solids and less phosphorous, coliform and residual chlorine
Operating costs, including power consumption, have been reduced by 42 % annually
Reclaiming water for irrigation reduces demand for potable water and boosts local agriculture.
Upgrade provides capacity for at least 20 years of population growth
1,000 ha water treatment site has become a recreational area and provides habitat for many wildlife species
Challenges
Engaging the entire community in the project was a challenge. Council emphasised building relationships within the community and surrounding area and with stakeholders including provincial agencies and local First Nations.
Lessons learned
Ensure that you have clear lines of communications between regulators, designers, staff, contractors and stakeholders.
Hold monthly meetings with regulators to ensure compliance with legal and regulatory requirements.
Think long term and go beyond conventional and accepted solutions.